software design
-
Technical spec - done from cc0028 1411 days old
Well, all bar the shouting. This Christmas break has been pretty much successful in getting things back on track. I had rather let things slip through ...
Tags: -
Over the second hurdle from cc0028 1414 days old
So I got my mark for my project design, and it's a B. That will do very nicely, thank you. I've long since put away any thoughts of getting an A: still ...
Tags: -
Waiting and waiting ... from cc0028 1415 days old
Still don't have a mark for the design. I suppose tutors have to have a Christmas break as well. It would have been nice to go into the New Year knowing ...
Tags:
